Thursday, September 30, 2010
Monday, September 13, 2010
Bathroom Remodel #2
This was a complete bathroom remodel. The toilet, sink, counters, tub, and tub surround were torn out and replaced. The walls were painted. The cabinets were painted and hardware was replaced.
China Slate Autumn 13x13 Tile
Subscribe to:
Posts (Atom)